From the Field: Wells Fargo Lobby Installation

A photo update of our installation progress on-site in Norfolk, Virginia (see the project rendering belowfor the final vision). Most of the steel has been installed and a few FLAT-Lite™ LED panels were tested.  Everything fit together perfectly and it looks like the columns will be installed tomorrow.

Wells Fargo Lobby Backlit Features Rendering
Reception Wall Installation Progress
The reception wall (above) had some framing adjustments, which pushed back the column installation.  Steel and LED panels for reception wall will be going up today, translucent stone panels tomorrow.

Translucent Orange Mercury Onyx
All of the DURA-Lite™ panels are prepped, mechanical fasteners are aligned and secured, ready for installation.


Framing out the square lobby columns (above) in preparation for hanging our stone panels. 

All of Terry’s precise work and attention to detail in the framing systems and it’s soon going to be covered up with the stunning Mercury onyx panels! Check back soon for even more progress on the finish surfaces and lighting systems.